The Medical Mall 50kW solar system installation project was based on the TVA PPA (Power Purchase Agreement). The product installed was a tenK Wave roof-mounted ballast system. Huntsville Utilities worked with ACE, LLC SOLAR to assure that the system was tied into their electric grid according to TVA specifications, along with the partnership of Redstone Energy Group.